Walkdown Pro Training Program
Walkdown ProTraining Program
Walkdown Pro Training Program · Unit 100

Read the drawing. Walk the line. Redline what's real.

Walkdown Pro Training Program takes you from never having seen a P&ID to reading drawings like an experienced inspector. You work from one matching set: a P&ID, an isometric, a 3D model and a pipeline alignment sheet. Every unit is hands-on: guided tours, tap-the-part drills, line tracing, symbol games, spot-the-error checks and building a P&ID from the model.

Document set
PID
100-PID-001 Rev 3P&ID – Inlet Separator V-101
Open
ISO
100-ISO-1001-01 Rev 0Isometric – line 6"-P-1001-A1A
Open
3D
100-MDL-0013D model – Unit 100 inlet area
Open
AS
AS-101 Rev 1Alignment sheet – 12" lateral, Sta 0+00 to 20+00
Open

Pick a track

Code content is summarized for training from ANSI/ISA-5.1, ASME B31.3, API 570, AWS D1.1 and A2.4, ASME B31.4/B31.8, API 1104 and 49 CFR Parts 192 and 195. Section numbers follow recent editions. Always inspect to the edition and client specification named in your contract, and use your company's redline procedure where it differs from the convention taught here. The drawings are a fictional training unit and are not for construction.

100-PID-001 · Rev 3

P&ID – Inlet Separator V-101

Drag to pan, scroll to zoom. Hover any symbol for its tag and meaning, click to pin it.Drag to pan, pinch to zoom, tap any symbol to see what it is. Use Full screen for a bigger view. Use the grid letters and numbers on the border to call out locations ("LV-101 is in D7").

100-ISO-1001-01 · Rev 0

Isometric – 6"-P-1001-A1A

Same line as the P&ID and the model. HoverTap welds, fittings, supports, the BOM and notes. Shop welds have round tags; field welds have square FW tags.

100-MDL-001

3D Model – Unit 100 inlet area

Left-drag to orbit, right-drag to pan, scroll to zoom. Click an object to read its properties, like Navisworks.One finger to orbit, two fingers to pan, pinch to zoom. Tap an object to read its properties. Measure gives distance and ΔE / ΔN / ΔEL between two points, in plant coordinates (feet).

Practice · As-built redline

Redline the field changes

You walked line 6"-P-1001-A1A and found the conditions listed on the work order. Mark them up the way they would go back to engineering. Red adds, green deletes, blue is a note. Cloud every change. Then check your markup.

AS-101 · Rev 1 · Pipeline track

Alignment Sheet – 12" lateral

Cross-country pipe is drawn on alignment sheets instead of isometrics: plan view on top, profile below, data bands along the bottom, all tied together by stationing.